House Slabs in Perth
A house is only as good as the slab under it. We pour house slabs and footings for owner builders and contractors across Perth, metro and surroundings. Level, measured and finished so the frame, tilers and flooring trades can get straight to work.
How we build your house slab
Most house slabs take 2-3 days on site, from formwork through to pour and finish. Here’s what happens, step by step.
-
We start by setting out the slab from your plans: measuring wall positions, checking levels and running string lines so everything sits exactly where it should. Then the formwork goes up.
-
Place the timber or fibreglass boards around the house perimeters. Now it is ready for the digger.
-
Once the footing is dug, the plumber does the pre-lay plumbing and the termite spray gets done, then we pour the footings to your engineering plans.
-
The next day, the plastic membrane goes down, followed by the mesh, bar chairs and reinforcement, so the steel sits at the right height inside the slab.
-
We pour the slab and finish it smooth and level, ready for the trades that follow.
-
Once the slab has set, we strip the formwork boards, wash down the boards and tools, and leave the site tidy.
Built for Perth heat
Perth summers are hard on fresh concrete. Heat and wind make a slab go off faster, and that’s when finishes suffer and cracks start. That’s why we book the concrete for the earliest possible delivery and pour first thing in the morning to beat the sun. If the weather isn’t right on the day, we’d rather wait than compromise your slab.
To Keep Your Start Date On track Please Have These Ready
What owner builders and contractors need before we start
01
Council approved plans
02
House plans and site plans, including engineering drawings
03
Earthworks completed and the site prepared
04
Easy access to the site for our crew and the concrete truck
How long does a house slab take?
The job itself usually takes 2-3 days on site. Your start date depends on our bookings calendar, so get in touch as early as you can, ideally once your plans are approved, to secure the date you want.
Why owner builders choose Leo’s Concrete Works
Leo has 20+ years on the tools with proven skillsets clients speak to and is on every pour
Skilled at reading all plans even picking up known mistakes
Thorough checking against your plans and site before any work begins
Clear, detailed quotes up front, with no surprises on the invoice
Fully insured | ABN 37870208139
Recent house slabs
FAQs
-
Most house slabs take 2-3 days on site, from formwork and footings through to the pour and finish.
-
Yes. Most of our work is for owner builders. We keep communication clear and tell you exactly what you need ready before we start.
-
Council approved plans, house and site plans with engineering, completed earthworks and easy site access for our crew and the concrete truck.
-
We book the concrete for the earliest possible delivery and pour first thing in the morning to beat the heat. If conditions aren’t right, we reschedule rather than risk your slab.
-
Weather is a big factor so we keep an eye on the forecast.
If conditions aren’t right, we will reschedule to the next suitable day and keep you updated.
We’d rather wait a day than compromise your slab.
Ready to talk about your slab?
We are not the cheapest, and we don’t try to be. If you value a slab done right the first time, send us your plans for a free, detailed quote.
Call 0473382356